Small Projects

Harvest Moon - Linear conversions

This week, our skilled team took on the task of converting two Bauer linear irrigators to Valley linear systems. We’re proud to say that it was a seamless operation! The switch-over was completed efficiently, and we had everything commissioned and back to watering on the same day.

Sweets Strawberries QLD

Our team recently travelled to the heart of Outback Queensland to tackle a significant challenge: the removal of an entire processing plant.
With limited diagrams available, we are prepared for the intricate task of reassembling all components with the utmost precision.
This involved:

  • Developed the plant operation procedure
  • Cable identification and labelling
  • Isolation and disconnection of power and control wiring
  • Removal of sensors and electrical equipment

Pipeline Drillers Group - Western Rising Main Project

We had the pleasure of collaborating with Pipeline Drillers Group on the Western Rising Main project in Launceston. Elite provided essential support to Pipeline Drillers throughout the project, ensuring their equipment was well-maintained and operational during critical phases.
Congratulations to Pipeline Drillers Group on the successful completion of the final pipeline installation, an 1100m 900mm poly line under the Tamar River.
This involved:

  • Diagnosing and repairing critical infrastructure
  • Out of business hours support
  • Replacement of critical hardware